2019 Facility Tour: DigIndy Tunnel Project

Monday, February 11

11 a.m. – 1:30 p.m.

$50 Early Bird
$60 Advance
$70 On-Site

The DigIndy Tunnel System is a 28-mile long network of 18-foot diameter deep rock tunnels being built 250-feet beneath the city. Along with other projects in the combined sewer system and at Citizens two advanced wastewater treatment plants, the $2 billion program is Indy’s solution to reducing combined sewer overflows into area waterways by up to 97 percent, and keeping the utility in compliance with a Consent Decree with the U.S. Environmental Protection Agency. This tour will first provide attendees with an overview of the project and a first-hand look at the active excavation site. Learn more about the DigIndy project.

Space is limited to the first 50 registrants. Participants should be able to climb two flights of stairs.

Itinerary

11 a.m.: Gather at Event Center Drive pickup, JW Marriott (adjacent to Indiana Convention Center), to get your boxed lunch, hard hat, safety vest and safety glasses.

11:30 a.m.: Transportation to excavation site

11:45 a.m.: Arrival at excavation site

11:45 a.m.-1:15 p.m.: Tour of active excavation site

1:15-1:30 p.m.: Transportation back to JW Marriott

1:30 p.m.: Arrival at JW Marriott

By continuing your visit to this site, you accept the use of cookies and other technologies to ensure the best possible use of our site, for web analytics and to provide you with content tailored to your interests. We sometimes share cookie data with third parties. Find out more in our Cookie Policy.